FULU CNC machine tool product line in the factory

FULU CNC Product Selection

CNC Machine Tools for Industrial Part Production

Compare machine families by workpiece profile, machining operations, working envelope, and production requirements. Use the product routes below to narrow the starting point before reviewing an exact configuration.

Part ProfileRotational, prismatic, or large-format
OperationsTurning, threading, milling, drilling
Working RangePart dimensions, travel, and table needs
Production ContextVolume, setup, tolerance, and automation

Machine Families

Choose the Product Route That Matches the Workpiece

Each family begins from a different part profile and process. Open the relevant category to compare structures before moving to a verified model page.

Product availability, model range, controller, tooling, automation, and standard-versus-optional equipment must be confirmed for the selected configuration.

Product Selection Path

Select by Part, Process, and Working Range

A machine name alone does not establish fit. Begin with the part and machining sequence, then confirm the working envelope, production context, and acceptance requirements.

Define the Part

Share the drawing, material, maximum dimensions, weight, tolerance, and required surface finish.

List the Operations

Identify turning, threading, milling, drilling, tapping, contouring, and the intended process sequence.

Check the Envelope

Confirm turning diameter and length, or travel, table size, load, clearance, and workholding space.

Set Production Needs

State batch size, setup frequency, cycle target, tooling, automation, controller, and acceptance needs.

Starting Part / Process Initial Machine Route Confirm Before Selection
Rotational partsTurning, facing, boring, or threading CNC Lathes Diameter, length, bore, chuck or workholding, tooling, volume, and process sequence
Pipe and thread workPipe-related turning and thread requirements Pipe Thread Lathes Pipe diameter, length, bore, thread standard, pitch range, workholding, and inspection method
Prismatic partsMilling, drilling, tapping, or contouring Vertical Machining Centers X/Y/Z envelope, table and load, spindle and tool requirements, fixtures, and optional-axis needs
Large workpiecesBroad surfaces or larger access requirements Gantry Milling Machines Part size and weight, travel, table, head access, setup plan, lifting, and foundation requirements
Engineer comparing a workpiece drawing with machine selection requirements
Replace with an original drawing-review, part, or machine-selection image.

This table identifies a starting family, not a final model. Exact fit must be checked against verified machine data, tooling, workholding, options, and acceptance conditions.

Factory & Quality Evidence

Verify the Source and the Acceptance Process

Product selection should be supported by factory evidence and a clear inspection path. Review how machines are assembled, checked, documented, and prepared for the agreed acceptance scope.

FULU CNC machine assembly area in the factory

Factory and Manufacturing

Use original workshop and process evidence to understand where assembly, alignment, calibration, testing, and final preparation take place.

Factory EvidenceCurrent workshop, equipment, legal identity, and approved location
Process EvidenceApplicable assembly, alignment, calibration, and test stages
Inspection EvidenceCheckpoint, instrument, condition, criterion, and retained record
Certificate EvidenceIssuer, entity, standard, scope, validity, and verification path
Engineer reviewing a part drawing and CNC machine configuration
Replace with an original drawing-review, engineering, or configuration image.

Engineering & Customization

Move from a Machine Family to an Agreed Configuration

Configuration review starts with the part and production requirements. The review should separate standard equipment, selectable options, third-party items, custom-engineering work, and details still requiring confirmation.

  1. Requirement Review
  2. Feasibility Check
  3. Configuration Scope
  4. Technical Approval
  5. Acceptance Plan
Standard / OptionalIdentify what is included and which options affect price, fit, utilities, or delivery.
Third-party / CustomDefine the supplier, interface, integration responsibility, approval, and acceptance boundary.